Pagoda SL Group

W113 Pagoda SL Group => Drive train, fuel, suspension, steering & brakes => Topic started by: erickmarciano on April 12, 2016, 22:46:04

Title: pedal linkage......
Post by: erickmarciano on April 12, 2016, 22:46:04
Hi Guys
got all the engine linkage set well but from progressive part down I don't think its set well.
the rod going down to the pivot is under tension when I try to connect to the progressive linkage on intake.I tried lengthening it but its over extended no thread on the rod left.
should I lengthen rod #45?
the gas pedal also feels like its under tension.
anyone got a link on adjusting the pedal---firewall link---#45---vertical link to progressive block on intake?
in what order?
thanks
Title: Re: pedal linkage......
Post by: Tyler S on April 13, 2016, 01:59:37
You may need to adjust the nut and bolt #51 and #53 to get your pedal and cross rod on the firewall in the proper position. The lever in this location is slotted for adjustment.
Title: Re: pedal linkage......
Post by: erickmarciano on April 17, 2016, 00:36:47
I am having a real hard time adjusting the pedal/ spring position/ link from engine to the progresive part
Cant find the procedure anywhere

My car is a manual
Title: Re: pedal linkage......
Post by: ja17 on April 24, 2016, 01:01:09
Erick,

When the accelerator pedal is on the floor stop, the intake venture flap should be full open. The linkage tour should get you through the rest.
Title: Re: pedal linkage......
Post by: erickmarciano on April 24, 2016, 04:00:54
There are 3 adjustments I am confused on how to adjust ( what to do first)
1-The firewall one with the pedal and what hole  to place the spring
2- the rod going to the engine pivot
3- rod from engine pivot to intake

Thanks